SMART CONCEPT – REASONABLE COSTS
ARCHITECTURAL CONCEPT
by Graf Biscioni Architects, Winterthur
«Out in the green» was the project named by the architects due to its location in the hilly and green landscape in Eschlikon (Switzerland). A volume-saving, compositional structural design with two main trusses above the roof defines the architecture of the building. Half-sunk into the terrain, the new building is characterized by its red colored concrete of the basement as well as the blue painted wooden structure above the terrain. The glass façade allows to bring the green nature into the interior of the building, creating a unique atmosphere.
TIMELINE
The construction of the hall started in summer 2020. In January 2021 qiip was awarded by the architects to take over the construction management. The concrete work for the basement was ongoing at that time. qiip took over this task in February 2021 after a very short familiarization with the project. Nevertheless, the handover of the building to the client (municipality of Eschlikon) took place on time and just before Christmas 2021.
CHALLENGES
The high-quality requirements of the client and the architects demanded good coordination of all work as well as constant monitoring on site. Although higher costs in procurement as well as time delays in the delivery of materials (due to the corona pandemic) had to be managed. The tight schedule as well as the costs according to budget could be kept.
TEMPORARY THEATRE
2024 OLYMPIC & PARALYMPIC SUMMER GAMES
TEMPUS - A TEMPORARY BUILDING FOR THE UNO
THE VALLEY SUMMER FESTIVAL
SPORTSHALL 2021
Transforming history into future
2020 BIE WORLD EXPO DUBAI
2024 BID UCI Road WORLD CHAMPIONSHIP
Julius Baer Zurich E-PRIX 2018 | June 10th
2026 BID OLYMPIC WINTER GAMES
APASSIONATA PARK
2022 BID OLYMPIC WINTER GAMES
2020 BID YOUTH OLYMPIC WINTER GAMES
SONG CONTEST 2012